MV Normand Pacific – Mobilisation
Vessel alongside at AV Dawson’s Port of Middlesbrough No 2 berth for mobilisation operations.
Vessel alongside at AV Dawson’s Port of Middlesbrough No 2 berth for mobilisation operations.
Vessel arrived from Stralsund and underwent discharge operations at AV Dawson’s Port of Middlesbrough No 2 berth.
Vessel loading Project Cargo at AV Dawson’s Port of Middlesbrough No 1 berth.
Two out of gauge items loaded onto low loader trailers and transported to Tees Dock. Project Vessel berthed at Tees Dock awaiting delivery of the
Vessel alongside at Tees Dock No1 for mobilisation operations.
Vessel ready for sailing from Redcar Bulk Terminal after a cargo of 44,000MT of granulated blast furnace slag was fully discharged. All agency services completed